| 1. | North lantau expressway and lantau fixed crossing 北大屿山快速公路及青屿干线 |
| 2. | Transport - roads - landscape works along north lantau expressway 运输-交通控制-快速公路路线指示标志改善工程 |
| 3. | Regarding the traffic arrangements for the north lantau expressway since it was opened to vehicles , will the government inform this council 关于北大屿山快速公路通车后的交通安排,政府可否告知本局: |
| 4. | North lantau expressway taking shape with chek lap kok airport site in the background , airport railway depot and rail reserve on the right 赤?角机场作背景的北大屿山快速公路,右方为机场铁路车站及铁路预留空间 |
| 5. | Furthermore , the north lantau expressway is already forecast to be congested , connection to the cross links will further stretch its capacity 政府已预测北大屿山快速公路将会十分挤塞,如再连接跨界通道,只会进一步加重其负荷。 |
| 6. | A dedicated route away from residential area is adopted . it starts from north lantau expressway , tsing ma bridge , cheung tsing highway , tsing yi road west , tsing yi road and finally reaches cwtc at the southern side of the tsing yi island (二)运送路线远离住宅区,以北大屿山公路作起点,经青马大桥、长青公路、青衣西路和青衣路,最后到达位于青衣南端的化学废物处理中心。 |
| 7. | The patronage forecast for the airport express line ( ael ) made in the new airport master plan ( the plan ) in 1991 was based on a number of assumptions , including competition from buses , ael s fare level , air passenger volume and composition , and congestion on north lantau expressway 于一九九一年拟订的新机场总纲计划(计划)中所预测的机场快线乘客量,是基于一系列的假设,包括来自巴士的竞争、机场快线的票价水平、飞机乘客量和组合,以及北大屿山快速公路的挤塞情况。 |
| 8. | Whether the government will consider relaxing the present speed limit imposed on other major highways in the territory to bring it in line with that imposed on route 3 and route 9 , so as to avoid the occurrence of bottlenecks on those highways as a result of traffic coming in from the direction of the new airport and the north lantau expressway ; if not , why not 会否考虑放宽现时对本港其他主要公路施加的车速限制,使之与三号干及九号干的车速限制看,藉以避免有关公路在新机场启用及北大屿山快速公路通车后, |